The plumber rocked up around 2.30 and got the heater installed, after MONT spent ages drilling through 2 courses of brickwork to create a hole big enough for the gas pipe to fit through. The plumber also fixed up a couple of small problems in the bathroom and fitted all of the taps. He also installed the new kitchen sink and tap. It looks terrific too!
This is the overgrown passionfruit vine that's taken over the carport
The rear of Number 3. The room here with the rusty tin roof is the bathroom
All in all it was a hectic day, but a really terrific one because the house is looking fabulous!